Energy

Choose your project

Energy

Rehabilitation of the Qairakkum HPP

Rehabilitation and replacing of the worn-out and outdated equipment of the plant.


Rehabilitation of the Qairakkum HPP

USD 201,000,000

Including:

Local input: -
Required investments: USD 201,000,000

Project initiator:

OSHC «BARQI TOJIK»

Type of ownership:

Open stock holding company, 100%
of the shares owned by the Government
of the Republic of Tajikistan

Project objective:

Replacement of the generating units, hydromechanical equipment,
and rehabilitation of the dam.

Location:

To Dushanbe is 360 km away
and to Khujand is 17 km away.

Markets:

Local consumers

Project realization period:

1,5 year

Current Stage:

Rehabilitation of the Qairakkum HPP
facebook
Energy

Rehabilitation of the Nurek HPP, phase 1

Improvement of the reliability and safety operation of the HPP and accordingly,
the uninterrupted power supply for the country


Rehabilitation of the Nurek HPP, phase 1

USD 327,000,000

Including:

Local input: -
Required investments: USD 327,000,000

Project initiator:

OSHC «BARQI TOJIK»

Type of ownership:

Open stock holding company, 100%
of the shares owned by the Government
of the Republic of Tajikistan

Project objective:

Rehabilitation and replacing of the worn-out and outdated equipment of the plant.

Location:

Nurek city, st. Industrial Zone

Markets:

Local consumers

Project realization period:

Phase 1: 1.5 years

Current Stage:

Rehabilitation of the Nurek HPP, phase 1
facebook
Energy

Construction of a Sanobod HPP, 200 Mw

The construction of the Sanobod HPP is mainly aimed at generating additional electricity and increasing the export potential of the Republic of Tajikistan for the development of the energy markets of the countries of the region.


Construction of a Sanobod HPP, 200 Mw

USD 450,000,000

Including:

Local input: -
Required investments: USD 450,000,000

Project initiator:

Ministry of Energy and Water Resources
of the Republic of Tajikistan

Type of ownership:

Public/Private

Project objective:

The construction of this facility, along with improving the situation with the provision of electricity to the local energy systems
of Badakhshan (Pamir Energy – Badakhshan local network) and the national energy system of Tajikistan,
will also create conditions for exporting electricity to Afghan Badakhshan in the long term to northeast Pakistan.

Location:

Republic of Tajikistan, GBAO,
Rushan rayon, Sanobod village

Markets:

Local consumers
and neighboring countries

Project realization period:

4 years

Current Stage:

A preliminary draft project has
been developed. The project needs
a feasibility study.

Construction of a Sanobod HPP, 200 Mw
facebook
Energy

Construction of a Dombrachi HPP, 36 MW

The construction of the Dombrachi HPP will make it possible to create additional electricity generation at the local level and to increase the export potential of the Republic of Tajikistan for the development of energy markets in neighboring countries.


Construction of a Dombrachi HPP, 36 MW

USD 35,400,000

Including:

Local input: -
Required investments: USD 35,400,000

Project initiator:

Ministry of Energy and Water Resources
of the Republic of Tajikistan

Type of ownership:

Public/Private

Project objective:

It is assumed that the construction of this hydropower plant in the future will reduce the load on the central energy system
and thereby create the conditions for the construction of mini-plants for processing fruits, milk, leather, factories for cutting marble, producing bricks, etc.

Location:

Republic of Tajikistan,
Lakhsh district, Dombrachi village

Markets:

Local consumers
and neighboring countries

Project realization period:

2,5 years

Current Stage:

A preliminary draft project has
been developed. The project needs
a feasibility study.

Construction of a Dombrachi HPP, 36 MW
facebook
Energy

Construction of a 500 kW power transmission line

Construction of a 500 kW power transmission line Rogun HPP - Sangtuda-Puli Khumri. The primary significance of this project is the supply of electricity from
the Ragunskaya HPP to the power grid of Afghanistan.


Construction of a 500 kW power transmission line

USD 152,500,000

Including:

Local input: -
Required investments: USD 152,500,000

Project initiator:

Ministry of Energy and Water Resources
of the Republic of Tajikistan

Type of ownership:

Public/Private

Project objective:

Meeting the needs of the economy and the population of Afghanistan in electricity. Increasing the export potential of the Republic of Tajikistan.

Location:

Republic of Tajikistan, Rogun HPP –
Sangtuda – Puli Khumri

Markets:

Local consumers
and neighboring countries

Project realization period:

2,5 years

Current Stage:

A preliminary draft project has been
developed. The project needs
a feasibility study.

Construction of a 500 kW power transmission line
facebook

Why are we?

Key

Key to growth

money

Mutual benefits

partnership

Win-win partnership

Get started

So, what exactly are you looking for?

Fill out this form, and we'll get back to you with a variety of options.